Takeoff to bid day in one file.
For estimators at commercial subcontractors and mid-market GCs. Measure the drawings, price the scope and submit the number from one project, with every addendum tracked along the way.
Sign in or start a bid- Plans
- Takeoff
- 3Pricing
- 4Bid
- 5Export
| Item | Qty | Unit | Extended |
|---|---|---|---|
| 5/8 in. Type X GWB | 18,420 | SF | $41,812 |
| 3-5/8 in. 20 ga studs | 6,115 | LF | $22,630 |
| ACT 2x2 lay-in | 9,880 | SF | $38,532 |
| Level 4 finish | 18,420 | SF | $12,894 |
| Subtotal · 4 of 64 items | $115,868 | ||
Quantities land in the bid without re-keying.
Takeoff conditions feed the pricing grid directly. Waste applies to material only, then sales tax, overhead and bond stack in a fixed order that you can read line by line. Change a quantity on the sheet and the total follows.
Every addendum, compared sheet by sheet.
Drop in the revised set. Vectadiff matches each sheet to its previous revision, shows what moved, and lists the takeoff conditions that sit on the changed areas.
| Sheet | Title | Change | Takeoffs affected |
|---|---|---|---|
| A101 | Floor plan, level 1 | 14 changes | |
| A201 | Reflected ceiling plan | 3 to review | |
| A501 | Wall types | No change | |
| A602 | Door and hardware schedule | 2 changes |
Risky spec language, found before you price it.
The project manual is read for liquidated damages, retainage, warranty terms and scope traps. Each finding cites the section it came from, so you can check the source in one click.
- Flagged: Liquidated damages of $2,500 per calendar day00 72 00 · General conditions
- Flagged: Retainage held at 10% until final completion01 29 00 · Payment procedures
- Flagged: Level 5 finish required in all corridors09 21 16 · Gypsum board assemblies
- Flagged: Two-year installer warranty starting at owner occupancy01 78 36 · Warranties
Your next bid, start to submit.
Feet, inches and fractions throughout. Every dollar traces back to a quantity on a sheet.